Jeannie is medically “grounded” (to the US) for 2018 so we decided to spend some of our travel funds to renovate our master bathroom. By the end of week 2 of the renovation we were so happy with the work we decided to also renovate our smaller bathroom. The smaller bathroom was completed at the end of week 5. We are very happy with both of them.
Jeannie’s new ICD was implanted October 29, 2018.
First our master bath where we had a huge jacuzzi tub removed, and a beautiful shower went in. The space that was the shower is a step out area with a seat and drain to dry off. I saw this in a hotel in Paris a long time ago and thought the step out was a great idea.
T